|
FTP Schedule Task Settings
What the task does will be displayed on top of the general page of settings.
For synchronization task you can change the remote folder or local folder
for synchronization. For each schedule task you can specify the launch time,
end time and task repetition option.
Note that TurboFTP will take action specified in the On Transfer Complete
section ([Options | Events]) upon transfer completion (either forced or
not) of each task.
Launch Time and Force Finish Time
When you create a new schedule task, the launch time will be preset to current
time plus 30 minutes and the forced end time preset to current time plus
60 minutes.
By enabling Force Finish Time you can specify the date and time at which
the task should be terminated no matter whether it is completed by then
or not.
Pressing the button
on the right side of the launch time field or end time field will set correspondent
date and time to current system time, which can be convenient when adjusting
the date/time value.
Repeat Task
To repeat a task, select the checkbox Repeat Task. You can then specify
how often the task is run in minutes, hours, days, weeks, months, quarters,
or years. If you choose to run a task every some weeks, you can also select
multiple days for each week to run the task. If you choose to run a task
every some months, you can specify which day in every month by either entering
a day number or choose from a range of day of week.
Note that if you enter a number between 29 and 31 as the day of each month
to run the task, the task runs only in the months that have the day.
Fig. Session Task Settings
Sync Task Specific Options
For sync task there is an additional
page for you to specify synchronization options, which are specific for
each individual sync task, although they are identical to those found in
the Advanced Site
Settings, which are for Folder
Synchronizer only.
Fig. Sync Task Options
|